Thursday, April 14, 2011

Gateway Technical Institute adds 3 Windspire wind turbines


For those of you that have driven or walked around the Racine Gateway Campus you have probably noticed the newly installed Windspire wind turbines. ESS installed the three units and they are now producing electricity for the campus. The units are located on the east side of the building and are very easy to see.

Just another way Gateway is looking to improve the look of the campus for the students and to help offset  the rising energy costs.




5 comments:

  1. Thanks for sharing its !
    Electrician Manly is the best alternate for preparing electric details according to the electric load, safety of high level equipments and installing warehouse lighting, etc.
    Electrician North Sydney

    ReplyDelete
  2. How are these turbines doing now? Have these improved the status of the school in terms of costs in electrical systems? How long did they take before they fully implemented the wind turbine system?

    Vivan Lantry

    ReplyDelete
  3. Hi Vivan... The units are doing well, spinning like crazy. Schools use alot of electricity, the units were designed to power certain areas and they are doing that well. If you are asking about installation, it takes about two days to install, including assembly of the units in our shop and on the job. Thanks for reading our blog, I hope you continue to do so and please tell your friends.

    ReplyDelete
  4. With this blog you really took our attention to the points that we never thought about. Thanks for sharing this with all of us. Panel Upgrade Experts Panel changes can be completed within one working day.Our expert technicians providing dedicated services that includes installation of proper sized electrical panels.
    calgary electrician

    ReplyDelete
  5. Nice update on the addition of wind turbines. This should be expanded to other locations too. - new build electrician richmond hill

    ReplyDelete